Thursday, August 27, 2009

Rock wool







12v wiring and insulation


the ceiling





storage loft with chimney





Red roof






roof and chimney flashing


closer up


ridge cap to go on after we leave the building
house = 13' 4" warehouse doors = 13' 3"





Thursday, August 6, 2009

The siding






siding started


one wall done





window trim








Wednesday, August 5, 2009

Windows etc.





ready for siding


trim ready for painting


windows in


gable window and trim


inside windows


other side




Friday, July 24, 2009

More roof




sheathing complete


roof sweeper


in the loft


cool glowing effect


main walls bolted down.
had 4 plates welded to the frame on each side for some more 1/2 inch bolts.






Monday, July 20, 2009

The roof








setting the ridge beam height


rafters up


gable window framing


other end


top view




Sunday, July 12, 2009

Special mention





Robbie changing light bulbs


Drew holding light bulbs

These are the guys we rent the space from. We really lucked out when we took this place. We have everything we need here to build our tiny house (including just enough room to get it out the doors). They have been really helpful, offering good advice and ideas and every tool we didn't get or haven't heard of. So thanks to them for making our house turn out better than we could have done on our own.