Sunday, June 28, 2009

The foundation




Workin' underneath


Floor framing complete. The floor joists are 4x4s centered on the cross members of the frame up to the rear section. The plan is to bolt these to the frame.


Insulation installation


Sealing the gaps


Insulation complete


Floor joists and carriage bolts


12 1/2 inch bolts through the frame